UPDATES: 01/2018: In August, 2014, an overweight truck was driven onto the bridge which caused the deck and substructure to be damaged. The bridge was closed to traffic for 8 months while repairs were made. The work, which involved about 30% of the bridge, was done in accordance with the ... » Learn More about Glimmer Glass Bridge